In August 2011, E.T.& L. Corp. received the contract for a MassDOT bridge rehabilitation project in Chicopee, MA. The I-90 bridge located over Route I-391 was in desperate need of repair, but because of its location along the busy Massachusetts Turnpike, could not undergo a full reconstruction. E.T.& L. began the first of three construction phases in October 2011. Keeping limited traffic open in both directions throughout, the full scope of work includes: replacement of the...


                    View more photos

In March 2011, the City of Haverhill and Aggregate Industries awarded the Southern Mound Closure project to E.T.& L. Corp. Located at the former Haverhill Municipal Landfill,  the Southern Mound contains  35 acres of landfilled waste. Before capping the site, the project first calls for extensive regrading and shaping of 250,000 cubic yards of material. The capping system itself will be Standard MassDEP, using 40 mil HDPE geomembrane liner. E.T.& L. began work in late May...


                    View more photos

 

Located over the Taunton River, the Summer Street Bridge spans the town line between Bridgewater and Middleborough, MA. In January 2011, MassDOT awarded E.T.& L. Corp. the contract for its replacement. E.T.& L. began work in the spring of 2011, first demolishing the existent Summer Street bridge structure, then erecting a new single span, precast concrete beam bridge in the same location. The new bridge is an integral...


                    View more photos

 As a result of Tropical Storm Irene, the Cold River surged, causing sections of Route 2 in Charlemont and Savoy, MA to be washed out and the roadway made unsafe and impassable. In mid-October 2011, MassDOT put out an emergency repair contract, which they awarded to E.T.& L. Corp. This $5.3 million contract required E.T.& L. to construct approximately 5,000 cubic yards of gabion walls between Route 2 and the Cold River to facilitate the reopening of the roadway by December 15,...


                    View more photos

 On August 28, 2011, Tropical Storm Irene dumped six to ten inches of heavy rain on portions of the Western Massachusetts causing rivers to rage and washout everything in their path. This deluge destroyed dams, culverts, roadways, and bridges in and along many rivers.  On Monday morning, August 29, 2011, MassDOT District #1 asked E.T.& L. Corp. to mobilize our forces to Route 8A in Hawley, MA; They needed us to quickly reconstruct several sections of the roadway that had been...


                    View more photos

This project  in Williamstown, MA replaces a deteriorated concrete, planted retaining wall along Route 2 with a new planted wall. In addition, a galvanized steel pile and concrete panel retaining wall must be installed. The reconstructed concrete evergreen wall will be built using stacked concrete bins filled with soil and  plantings. This wall will support the slope above Route 2, while the steel pile and concrete panel wall will support the slope below. The...


                    View more photos

 In early 2011, MassDOT awarded E.T.& L. Corp. with a $9,081,866 contract for a bridge project in Lawrence, MA. The majority of work consists of constructing a new Canal Street Bridge over the Spicket...


                    View more photos

This project consists of the demolition and reconstruction of an existing bridge carrying Route 19 (Wales Road) over Mill Brook. E.T. & L. Corp. will complete the project in two phases, utilizing a temporary traffic signal to control traffic during construction. The new bridge will be supported by concrete abutments with a steel pile foundation. Sixty-six (66) foot long concrete NEXT beams will then be set on top of the concrete abutments, followed by the pouring of a concrete...


                    View more photos

May of 2010 brought E.T.& L. Corp. its first Design Build project with CSX Bridge Bundle #3. E.T.& L. is the managing partner in a joint venture with J.F. White Contracting Company for this project for the Massachusetts Department of Transportation. Bridge Bundle #3 is part of a comprehensive statewide project to raise bridges and, in some locations, undercut the railroad tracks, so that CSX can run their double stack freight trains in and out of Massachusetts. The two year project...